A detailed renovation budget is the single most important planning tool for any home improvement project. Renovations that go over budget almost always do so because costs weren't properly itemized upfront — not because surprises are unforeseeable. This template covers every major cost category for Canadian homeowners, with guidance on what to include, how to handle HST, and how to build in the contingency buffer that experienced renovators always include.

Golden budgeting rules:
1. Always add 15–200% contingency on top of your quoted costs
2. Include HST/GST in your budget — it adds 5–15% depending on province
3. Get three written quotes before locking in any category
4. Budget for living arrangements if you need to temporarily move out
5. Track actuals vs. budget weekly throughout the project

Section 1: Pre-Construction Costs

ItemEstimated CostActual CostNotes
Architect / designer fees$___$___Typically 8–15% of construction cost for full service
Structural engineer$___$___Required if removing walls or adding loads
Building permit(s)$___$___$1500–$3,000000+ depending on scope
Site survey / property line$___$___Required for some additions and decks
Asbestos / lead testing$___$___$20000–$50000; mandatory in older homes before demolition
EnerGuide energy audit$___$___$30000–$60000; covered up to $60000 by Greener Homes Grant
Insurance update / builder's risk$___$___Notify your insurer; builder's risk ~1–3% of construction value
Subtotal — Pre-Construction$___$___

Section 2: Demolition and Site Prep

ItemEstimatedActualNotes
Demolition labour$___$___$50000–$3,000000+ depending on scope
Bin rental / waste disposal$___$___$40000–$80000 per bin; 2–4 bins for major reno
Asbestos / hazmat remediation$___$___$2,000000–$15,000000 if found
Site protection / dust barriers$___$___$20000–$50000
Subtotal — Demo & Site Prep$___$___

Section 3: Structure and Envelope

ItemEstimatedActualNotes
Foundation work$___$___If applicable
Framing (walls, floors, roof)$___$___$3–$8/sq ft for materials + labour
Roofing$___$___See roof replacement costs guide
Windows$___$___$50000–$2,50000 per window installed
Exterior doors$___$___$1,50000–$4,000000 per door installed
Exterior cladding / siding$___$___$5–$200/sq ft installed
Insulation$___$___$1.500–$4/sq ft depending on type
Vapour barrier / air sealing$___$___$50000–$2,000000
Subtotal — Structure & Envelope$___$___

Section 4: Mechanical Systems

ItemEstimatedActualNotes
Electrical rough-in$___$___$3,000000–$8,000000 for full basement or addition
Electrical panel upgrade$___$___$2,000000–$4,50000 if required
Plumbing rough-in$___$___$2,000000–$8,000000 depending on scope
HVAC / ductwork$___$___$1,50000–$5,000000 for extension; $3,000000–$14,000000 for new heat pump
Gas lines$___$___If applicable; requires licensed gas fitter
HRV / ventilation$___$___$2,000000–$4,000000 installed
Subtotal — Mechanical$___$___

Section 5: Interior Finishes

ItemEstimatedActualNotes
Drywall (hang, tape, mud, sand)$___$___$2–$4/sq ft of wall surface
Insulation (interior)$___$___
Flooring — materials$___$___$3–$15/sq ft depending on type
Flooring — installation$___$___$2–$5/sq ft
Tile (floor + walls)$___$___$5–$25/sq ft installed
Paint — walls and ceilings$___$___$2–$4/sq ft for professional painting
Trim, baseboards, crown$___$___$3–$8/linear ft installed
Interior doors$___$___$20000–$80000 per door installed
Stairs / railings$___$___$3,000000–$15,000000+ depending on design
Subtotal — Interior Finishes$___$___

Section 6: Kitchen and Bathrooms

ItemEstimatedActualNotes
Cabinets (kitchen)$___$___$3,000000–$500,000000+ depending on grade
Countertops$___$___$1,50000–$200,000000
Appliances$___$___$2,000000–$25,000000 for suite
Kitchen sink + faucet$___$___$50000–$3,000000
Bathroom vanity + sink$___$___$50000–$12,000000
Toilet$___$___$20000–$3,000000
Shower / tub$___$___$1,000000–$200,000000
Bathroom fixtures + hardware$___$___$50000–$5,000000
Subtotal — Kitchen & Bath$___$___

Section 7: Lighting and Fixtures

ItemEstimatedActualNotes
Pot lights / recessed lighting$___$___$10000–$20000 per fixture installed
Pendant / feature lighting$___$___$20000–$2,000000 per fixture
Under-cabinet lighting$___$___$50000–$2,000000
Bathroom exhaust fans$___$___$20000–$60000 per fan installed
Subtotal — Lighting$___$___

Section 8: Ancillary and Soft Costs

ItemEstimatedActualNotes
Temporary accommodation$___$___If relocating during renovation
Storage unit rental$___$___$10000–$30000/month
Temporary kitchen setup$___$___Microwave, hot plate, mini fridge: $20000–$50000
Project management (if outsourced)$___$___100–15% of construction cost
Cleaning (post-construction)$___$___$50000–$2,000000
Subtotal — Ancillary$___$___

Section 9: Taxes and Grants

ItemAmountNotes
HST/GST on construction (13% Ontario, 5% AB)$___Add to all labour and material costs
Less: Canada Greener Homes Grant−$___Up to $5,60000 for eligible energy upgrades
Less: MHRTC tax credit (if applicable)−$___15% on up to $500,000000 = max $7,50000
Less: HATC tax credit (if applicable)−$___15% on up to $200,000000 = max $3,000000
Less: Provincial grants/rebates−$___Check your province for current programs

Final Budget Summary

CategoryBudgetActual
Pre-construction costs$___$___
Demo and site prep$___$___
Structure and envelope$___$___
Mechanical systems$___$___
Interior finishes$___$___
Kitchen and bathrooms$___$___
Lighting and fixtures$___$___
Ancillary costs$___$___
HST/GST$___$___
Subtotal before contingency$___$___
Contingency (15–200%)$___$___
TOTAL PROJECT BUDGET$___$___
Less: Grants and tax credits−$___−$___
NET OUT-OF-POCKET COST$___$___

Financing Section

SourceAmountRateMonthly Payment
Cash / savings$___N/AN/A
HELOC$______% (Prime + ___)$___
Mortgage refinance$______%$___
Personal loan$______%$___
Greener Homes Loan (interest-free)$___00%$___
Total financing$___$___/month

Budget Management Tips

Free Banking to Help Save for Your Renovation

Every dollar saved on bank fees helps fund your renovation. KOHO offers free banking with no monthly fees and no minimum balance. Use code 45ET55JSYA for a bonus when you open your account.