Renovation Permits Ontario: 2026 Complete Guide

When do you need a permit for your renovation in Ontario? What does it cost? What happens if you skip it? Get all the answers here.

Permit Requirement Checker — Ontario

Select your renovation type to see if a permit is typically required in Ontario:

🔨 Fund Your Reno Smarter

KOHO's free account earns cash back on hardware store purchases. Every dollar helps offset renovation costs.

Get KOHO Free — Code 45ET55JSYA

Renovation Permit Requirements in Ontario: The Complete Guide

In Ontario, building permits are issued by individual municipalities (City of Toronto, City of Ottawa, City of Hamilton, etc.) under authority of the Ontario Building Code (OBC). The OBC is a provincial standard, but permit applications and inspections are administered locally. This means permit costs, processing times, and exact requirements can vary significantly between municipalities.

When Do You Need a Building Permit in Ontario?

Under the Ontario Building Code, a permit is generally required for:

Generally NOT requiring a permit: interior cosmetic work (paint, flooring, kitchen cabinet replacement, countertop replacement — unless plumbing moves), same-size window/door replacement, minor drywall repairs, insulation added to existing spaces without structural change.

The Ontario Building Permit Process

1. Submit permit application to your local municipality's building department. Applications can often be submitted online through municipal portals. 2. Pay the application fee (calculated based on project type and valuation). 3. Building department reviews drawings and specifications (2 days to 20 business days for residential). 4. Permit issued — construction can begin. 5. Post permit placard visibly at job site. 6. Book inspections at key stages (framing, insulation, drywall, final). 7. Final inspection and occupancy approval.

Building Permit Costs by Municipality (Ontario)

MunicipalityResidential Permit FeeProcessing Time
City of Toronto$24.12/m² (min $196)10–20 business days
City of Ottawa$12–$20/m² of project area5–15 business days
Peel Region (Mississauga)$18–$25/m²5–10 business days
City of Hamilton$10–$18/m²5–10 business days
City of London$8–$15/m²3–10 business days
Smaller municipalities$5–$12/m²3–7 business days

What Happens If You Don't Get a Required Permit?

Skipping permits creates serious risks for Ontario homeowners: